Info!
UPDATED 1 Sept: The EI library in London is temporarily closed to the public, as a precautionary measure in light of the ongoing COVID-19 situation. The Knowledge Service will still be answering email queries via email , or via live chats during working hours (09:15-17:00 GMT). Our e-library is always open for members here: eLibrary , for full-text access to over 200 e-books and millions of articles. Thank you for your patience.

One-stop concrete FPSO. Anon. J. Offshore Technol., February 1998, 6(1), 17, 18.

Cost-effective floating production using a concrete hull is described. This new vessel has been jointly developed by Brown and Root BARMAC, and Constain/Taylor Woodrow. The new design is configured so that fabrication can be completed in BARMAC's Nigg construction facility, thus enabling the entire vessel to be built at a single location, resulting in both cost and schedule savings as hull and topsides can be integrated and commissioned together.
Please login to save this item