Info!
The EI library in London is temporarily closed (re-opening on 1st June at the earliest), as a precautionary measure in light of the ongoing COVID-19 situation. The Knowledge Service will still be answering email queries via info@energyinst.org, and is available for live chats on this page during working hours (09:15-17:00 GMT). Our e-library is always open for members here: https://knowledge.energyinst.org/services/elibrary, for full-text access to over 200 e-books and millions of articles. We are sorry for any inconvenience.

High-pressure coiled-tubing technology solves resin-sand-control problems. Anon. JPT, June 1997, 49(6), 588, 589. (Synopsis OTC paper 8527).

Details are given of how CT technology now allows an offshore operator to remove extensive cement residue effectively from the wellbore and place chemical sand-control (SC) treatments in a high-pressure-gas environment. Defining SC placement, preplanning processes, equipment/materials requirements, fluid circulation system, fluid selection, BOP stack and cross manifold, and implementation and results are presented and discussed.

Abstract details


Please login to save this item