Info!
UPDATED 1 Sept: The EI library in London is temporarily closed to the public, as a precautionary measure in light of the ongoing COVID-19 situation. The Knowledge Service will still be answering email queries via email , or via live chats during working hours (09:15-17:00 GMT). Our e-library is always open for members here: eLibrary , for full-text access to over 200 e-books and millions of articles. Thank you for your patience.

Foster Wheeler has been awarded a front-end engineering design (FEED) and projec ...

Foster Wheeler has been awarded a front-end engineering design (FEED) and project management consultancy (PMC) contract by Ecopetrol for the Barrancabermeja refinery upgrade project in Colombia. The project will increase refining capacity from 250,000 b/d to 300,000 b/d, add heavy crude processing capability and provide a processing configuration to meet the projected 2013 Colombian clean fuels product specifications. The scope includes the following new units - a crude unit, delayed coker, hydrocracker unit, coker naphtha hydrotreating unit, hydrogen unit, sour water strippers, amine regeneration unit, and sulphur recovery unit, plus associated utilities and offsite units. The project will also include revamps to the diesel hydrotreater, gasoline hydrotreater and dismantling of two existing atmospheric and vacuum distillation units. In addition, the contract includes the procurement of long-lead items.
Please login to save this item