Foster Wheeler has been awarded an engineering and materials supply contract by ...

Foster Wheeler has been awarded an engineering and materials supply contract by Woodside for two gas turbine exhaust waste heat recovery units for the processing train at its Pluto LNG project in Western Australia. The two identical units will recover energy from gas turbines used for power generation, to provide hot water for use elsewhere in the facility. The engineering, procurement and construction management of the Pluto LNG project is being executed by a Foster Wheeler-led joint venture and includes a single LNG production train with forecast production of 4.3mn t/y of LNG, a fractionation unit, an acid gas recovery unit, gas purification units, tank storage facilities, a boil-off gas compressor, loading berths, gas turbine power generation units and utilities. First gas is scheduled for production at the end of 2010.

Please login to save this item