Info!
UPDATED 1 Sept: The EI library in London is temporarily closed to the public, as a precautionary measure in light of the ongoing COVID-19 situation. The Knowledge Service will still be answering email queries via email , or via live chats during working hours (09:15-17:00 GMT). Our e-library is always open for members here: eLibrary , for full-text access to over 200 e-books and millions of articles. Thank you for your patience.

Nooros fast-track development achieves production milestone

BP has confirmed production ramp up from the Nidoco North 1X exploration well and the Nidoco North West 4 development well in the Nooros field, located in the Abu Madi West concession in the Nile Delta, Egypt.

BP holds a 25% stake in the concession of Abu Madi West, and Eni, through its subsidiary IEOC, holds 75%. The field is operated by Petrobel, a joint venture between IEOC and the state partner Egyptian General Petroleum Corporation (EGPC).

Discovered in July 2015, the field is now producing around 305mn cf/d of gas, 3,000 b/d of condensates and 1,500 b/d of NGLs from four wells. This has been achieved after facility debottlenecking and enhancing existing production facilities.

The Nidoco W-2 exploration well was expected to spud in late May and will test a western segment of the field. Another exploration well, the BSW-1 (Barakish), was spudded by Petrobel in April, to test an analogous but separate reservoir north of Noroos. BP holds a 50% stake in the Baltim South development lease where the BSW-1 well is being drilled.

Development wells, including Nidoco North West 5 well spudded on 7 May, are expected to increase production over the course of 2016.

 

Please login to save this item