Info!
UPDATED 1 Sept: The EI library in London is temporarily closed to the public, as a precautionary measure in light of the ongoing COVID-19 situation. The Knowledge Service will still be answering email queries via email , or via live chats during working hours (09:15-17:00 GMT). Our e-library is always open for members here: eLibrary , for full-text access to over 200 e-books and millions of articles. Thank you for your patience.

Olkiluoto nuclear performance

The operator of Finland’s Olkiluoto plants 1 and 2 has reported that unit 1 produced its second best yearly production result in 2015, of 7.4 TWh; and that the combined production of the plants in 2015 was 14.3 TWh of electricity with a 92.7% load factor.

Olkiliuoto unit 2 was interrupted by a generator failure in February, leading to an 89% load factor. The performance figures for 2015 were the eighth largest in the plants’ 36-year history – and are partly due to a series of upgrade projects from 2010 to 2012.

Late last year we reported that the dogged Olkiluoto 3 unit, under construction and much delayed, will not start till 2018 at the earliest.

 

Please login to save this item