22nd and 29th July 2025 - Scheduled maintenance

We're upgrading our login system this week, between July 22nd and 29th, 2025, for enhanced security and a better experience. You may notice a new look when you log in, but your login details will remain the same. If you experience any issues, please log out and back in, clear your browser cache, or contact us

Info!
UPDATED 1 Sept: The EI library in London is temporarily closed to the public, as a precautionary measure in light of the ongoing COVID-19 situation. The Knowledge Service will still be answering email queries via email , or via live chats during working hours (09:15-17:00 GMT). Our e-library is always open for members here: eLibrary , for full-text access to over 200 e-books and millions of articles. Thank you for your patience.
New Energy World magazine logo
New Energy World magazine logo
ISSN 2753-7757 (Online)

Mine water heating scheme goes live in Wales

4/6/2025

News

Heat exchangers being installed into the treatment lagoons Photo: Mining Remediation Authority
Heat exchangers being lifted into lagoon by crane

Photo: Mining Remediation Authority

In a first for Wales, previously untapped heat from a mine water treatment scheme is now being harnessed to provide low-carbon heating for a nearby business.

The Mining Remediation Authority – operator of more than 80 treatment schemes across the UK – identified an opportunity for low-carbon heat recovery at its Lindsay treatment scheme near Ammanford, Carmarthenshire.

 

At Lindsay, 25 litres of mine water per second is pumped and treated – a process that removes approximately 28 kg of iron each day, preventing it from entering local watercourses.  

 

The mine water is naturally warm due to geothermal energy from the earth’s crust, which is retained by the water after time spent circulating through underground rock layers and former coal mines.

 

The project utilises heat exchangers submerged in one of the settlement ponds to recover heat from the mine water, which is then transferred to a nearby industrial unit to supply low-carbon heating and hot water. It is predicted to save 17.5 t/y of CO2.

 

Working in collaboration with local business Thermal Earth, the project, constructed in two weeks, secured funding through Innovate UK’s New Innovators in Net Zero Industry, South-West Wales initiative.

 

Andrew Simpson, Head of Innovation, By-Products and Services at the Mining Remediation Authority, comments: ‘This scheme demonstrates how Wales’ industrial heritage can be repurposed to support a low-carbon future. By unlocking the potential of mine water heat, we’re not only reducing emissions but also creating a blueprint for sustainable energy that can be replicated across the country.’