Info!
UPDATED 1 Sept: The EI library in London is temporarily closed to the public, as a precautionary measure in light of the ongoing COVID-19 situation. The Knowledge Service will still be answering email queries via email , or via live chats during working hours (09:15-17:00 GMT). Our e-library is always open for members here: eLibrary , for full-text access to over 200 e-books and millions of articles. Thank you for your patience.

Well tie-in. Conclusion. Examples illustrate sour gas and oil facility design. K.J. Vargas. OGJ, 12 October 1998, 96(41), 84--90.

Two examples are given that illustrate the design required to tie-in sour gas and oil wells to production facilities. The first of which is for a sour gas well that requires a dehydration unit and pipeline to sales. For designing a sour oil battery for 1600 b/d, a similar process to the sour gas well example was followed. Schematic illustrations, bar charts, and tabulated data are presented and discussed.
Please login to save this item