UPDATED 1 Sept: The EI library in London is temporarily closed to the public, as a precautionary measure in light of the ongoing COVID-19 situation. The Knowledge Service will still be answering email queries via email , or via live chats during working hours (09:15-17:00 GMT). Our e-library is always open for members here: eLibrary , for full-text access to over 200 e-books and millions of articles. Thank you for your patience.

PFEER/DCR and verification---meeting the challenge (and controlling the paranoia). M. McGowan. Paper. Prof. Conf., Risk assessment of offshore installations, Session 1, Paper No. 2, 6 pages (see abstract 845 for complete reference).

The implementation of a verification system in a new development project is described which began under the old prescriptive legislative phase and matured in the new goal-setting arena. Consideration is given to how the philosophy of PFEER was applied at the Armada field, and how the legislative response to it and DCR were formulated. Also the way in which the most safety critical things of all---people---were involved in bringing the Armada field into line with legislation in conjunction with the Verification body.
Please login to save this item