Info!
UPDATED 1 Sept: The EI library in London is temporarily closed to the public, as a precautionary measure in light of the ongoing COVID-19 situation. The Knowledge Service will still be answering email queries via email , or via live chats during working hours (09:15-17:00 GMT). Our e-library is always open for members here: eLibrary , for full-text access to over 200 e-books and millions of articles. Thank you for your patience.

Foster Wheeler has been selected by Sasol Technology to perform a pre-feasibilit ...

Foster Wheeler has been selected by Sasol Technology to perform a pre-feasibility study for a proposed new 80,000 b/d coal-to-liquids (CTL) facility, known as Project Mafutha, in South Africa. Project Mafutha (‘Mafutha’ is a Zulu word for ‘oil’) will involve an integrated CTL process comprising three key process steps for the conversion of coal into primary fuel products (gasoline and diesel); gasification of coal to synthesis gas; Sasol’s proprietary low and/or high temperature Fischer-Tropsch processes; and refinery technology for converting the Fischer-Tropsch products into fuel products.
Please login to save this item