Info!
UPDATED 1 Sept: The EI library in London is temporarily closed to the public, as a precautionary measure in light of the ongoing COVID-19 situation. The Knowledge Service will still be answering email queries via email , or via live chats during working hours (09:15-17:00 GMT). Our e-library is always open for members here: eLibrary , for full-text access to over 200 e-books and millions of articles. Thank you for your patience.

Siemens Power Transmission and Distribution (PTD) is to deliver a turnkey 400-kV ...

Siemens Power Transmission and Distribution (PTD) is to deliver a turnkey 400-kV/132-kV substation with gas-insulated switchgear to Dubai Electricity and Water Authority (DEWA) as part of the further expansion of the power supply system of the United Arab Emirates. The substation will link the H Station power plant at Al-Aweer to the country’s power supply network. The substation also completes the Emirates National Grid (ENG) by providing a link between the power plant and the power supply system of Abu Dhabi. Start-up is planned for the beginning of 2008.
Please login to save this item